completed projects
-
Supply of Mersen grounding brushesLead time3 monthsCompleted2026Energoline supplied Mersen grounding brushes (ABB P/N 3BSM011092-1) for the AMS 1250A generator rotor of a Siemens SGT-800 gas turbine unit. -
Supply of ABB air filtersLead time3 monthsCompleted2026Energoline supplied ABB air filters (P/N 2591038-1) for the AMS 1250A generator bearings of a Siemens SGT-800 gas turbine unit. -
Supply of IFM Electronic air flow sensorsLead time2 monthsCompleted2026Energoline supplied SL0101 air flow sensors manufactured by IFM Electronic. -
Supply of Bently Nevada modulesLead time3 monthsCompleted2026Energoline supplied Bently Nevada components for a gas turbine monitoring and protection system, including a Bently Nevada 3500/15-04-00-01 power supply module and a 133300-01 power input module. -
Supply of a Woodward GS6 fuel gas metering valveLead time6 monthsCompleted2026Energoline supplied GS6 fuel gas metering valves manufactured by Woodward (GE P/N: 334A1226P0001). -
Supply of Meggitt TSM 201 clutch controllersLead time4 monthsCompleted2026Energoline supplied Meggitt TSM 201 clutch controllers that measure the phase angle and speed difference between the gas and steam turbine shafts. -
Supply of Det-Tronics methane sensors and transmitters for a GE LM6000 gas turbineLead time3 monthsCompleted2026Energoline supplied Det-Tronics methane sensors (GE P/N: 382A4720P0001) and methane sensor transmitters (GE P/N: 398A2537P0001) for a GE LM6000 gas turbine unit. -
Supply of Meggitt staging valves for a GE LM2500 gas turbineLead time3 monthsCompleted2026Energoline supplied staging valves (Valve, Staging) manufactured by Meggitt Whittaker Controls. -
Supply of a T4.8 lower thermocouple harness for a GE LM6000 gas turbineLead time4 monthsCompleted2026Energoline supplied a T4.8 thermocouple harness (Harness, T4.8 Lower) for a GE LM6000 gas turbine unit. -
Supply of a SCHROEDER minimum flow valveLead time6 monthsCompleted2026Energoline supplied an SSV18-150/250-125/150/65/0-1 valve manufactured by SCHROEDER VALVES. -
Supply of shroud blocks for a GE LM6000 gas turbineLead time7 monthsCompleted2026Energoline supplied stage 1 and stage 2 shroud blocks for a GE LM6000 gas turbine unit. -
Supply of Kübler rotary encodersLead time3 monthsCompleted2026Energoline supplied Kuebler 8.5853.4224.G323.EX rotary encoders for a Siemens SGT5-4000F gas turbine unit.